How long does OEM sampling take?

Prototype lead time is confirmed per project after design freeze, and depends on whether a new mould is required. Every sample goes through the same in-house validation path as production parts — impact, fatigue and dimensional checks against ISO 4210 / EN thresholds — before it ships for your ride-feel assessment and approval.

← Back to OEM/ODM Service